projects
A modern commercial
architecture firm
specializing in creative,
affordable and
sustainable spaces.
HEALTHCARE
NHMC MOB TI
Northridge Hospital Medical Center – 18460 Roscoe Blvd, Northridge, CA 91325
A remodel of an existing shelled space of approximately 2,000 Sq Ft into an administrative office tenant improvement used for overflow including two new single user restrooms
HMNH Microbiology Lab Remodel
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
General upgrade of an existing microbiology lab to increase workflow and efficiency of the space including the installation of new casework and equipment.
RUHS Lab Refrigerator and Casework
Riverside University Health System – 26520 Cactus Ave, Moreno Valley, CA 92555
Partial remodel of an existing lab space to provide better workflow and efficiency of the laboratory. The scope of work includes the addition of new casework and the relocation of existing equipment for a multi-phase construction.
HMNH Clinical Lab Remodel
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
General upgrade of an existing microbiology lab to increase workflow and efficiency of the space including the installation of new casework and equipment
RUHS Labor & Deliver Monitor Installation
Riverside University Health System – 26520 Cactus Ave, Moreno Valley, CA 92555
The scope of work includes the installation of two new interactive monitors across an egress corridor at an existing nurse station.
NHMC Urgent Care Clinic
Northridge Hospital Medical Center – 18300 Roscoe Blvd, Northridge, CA 91325
Tenant Improvement of a non-OSHPD-3 and Non-Licensed 4,330 SF Urgent Care Clinic with an X-ray room, (7) exam rooms and (1) procedure room
HMNH Waiting Room Tenant Improvement
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
Tenant Improvement of an existing office and non-rated corridor into a new waiting area and reception in a non-licensed and non-OSHPD 3 clinic
NHMC SPD Tenant Improvement
Northridge Hospital Medical Center – 18300 Roscoe Blvd, Northridge, CA 91325
Development of a Schematic Design Package for the Tenant Improvement of an (E) Sterile Processing department
LLUMC Fire Riser Replacement
Loma Linda Medical Center – 11234 Anderson St, Loma Linda, CA 92354
Replacing the existing standpipe located in Stair 16 from the basement level to level 2 (four floors) and addition to patching back the stairs existing two hour rated fire barrier
LLUMC FP Patch Back and Temporary Generator
Loma Linda Medical Center – 11234 Anderson St, Loma Linda, CA 92354
Patch back the existing Sprayed Fire-Resistive Material located in the generator room and interstitial space above the room. During construction, the two (2) (E) 900 KW Generators #1 & #2 to be temporarily shut down and replaced with one (1) (N) Temporary 2000 KW generator for not more than seven (7) days max per OSHPD CAN 2-108
LLUMC Pharmacy UPS Installation
Loma Linda Medical Center – 11234 Anderson St, Loma Linda, CA 92354
Includes the installation of a new UPS (uninterruptible power supply) in an existing pharmacy to reduce the risk of power disruption
CCH La Mesa Anchorage
Community Care Center – 8665 La Mesa Blvd, La Mesa, CA 91942
Installation and anchorage of a (N) reach-in refrigerator and Freezer
HMNH Clinic IDF Tenant Improvement
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
Tenant Improvement of an existing IDF room in a non-licensed and Non-OSHPD-3 Clinic which includes the installation of (2) IT racks and (2) split units systems
NHMC Building Demolition
Northridge Hospital Medical Center – 18300 Roscoe Blvd, Northridge, CA 91325
Building demolition of an 8,500 SF (E) Two story wood frame building formerly used as a dialysis clinic.
USP 797/800 Pharmacy
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
Project was developed under the employment of another architecture firm
Remodel of 1,350 Sq Ft existing pharmacy into a chemo room and IV prep room for a USP 797/800 compliant compounding area. The project also includes the conversion of 1,150 Sq Ft of existing shell space including a storage room, an electrical room with a UPS and a staff breakroom.
Campus Egress Lighting
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
Project was developed under the employment of another architecture firm
Electrical upgrade to bring interior and exterior egress lighting up to the 2016 CBC code by replacing fixtures not on the emergency power branch and providing minor site work modification as required for improving code compliance of campus egress.
BHU Risk Management
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
Project was developed under the employment of another architecture firm
General BHU upgrades to utilize anti-ligature components including the upgrade of shower components, exit signage, corridor handrails, door panels/hardware and casework.
Pavilion Roofing Replacement
Henry Mayo Newhall Hospital – 23845 McBean Pkwy, Valencia, CA 91355
Project was developed under the employment of another architecture firm
Re-roofing the 30,000 Sq Ft Henry Mayo Newhall Pavilion building
Surgical Light Installation
East LA Doctor’s Hospital – 4060 Whitier Blvd, Los Angeles, CA 90023
Project was developed under the employment of another architecture firm
Installation of new surgical light in a labor and delivery operating room
E-power at patient beds
Community Hospital of HP – 2623 Slauson Ave, Huntington Park, CA 90255
Project was developed under the employment of another architecture firm
Installation of new emergency power receptacles at patient beds in addition to refrigerator anchors
Clean and soil room relocation
Community Hospital of HP – 2623 Slauson Ave, Huntington Park, CA 90255
Project was developed under the employment of another architecture firm
Relocation and reconstruction of clean and soil utility rooms to make room for a new endoscope processing room
8th Floor LDRP Remodel
Centinela Hospital – 555 E Hardy St, Inglewood, CA 90301
Project was developed under the employment of another architecture firm
Construction Administration for the 8th floor remodel of an LDRP Unit at Centinela Hospital
Medical Tower Connecting Corridor
Earlimart Clinic – 476 E Washington St, Earlimart, CA 93219
Project was developed under the employment of another architecture firm
Development of site for parking, sidewalks and ramps, landscaping, fencing and utilities for a future phase consisting of a type V OSHPD level 3 modular medical building
RESTAURANTS
Glendora Public Market Adaptive Reuse and Site Work
Glendora Public Market – 905 E Arrow Hwy, Glendora, CA 91740
Project was developed under the employment of another architecture firm
Adaptive reuse of an existing 19,000 SF abandoned Wonder Bread bakery into a food court with over Ten tenants.
RETAIL
Burlington Coat Factory Tenant Improvement
Burlington Coat Factory – 19817 Rinaldi St, Porter Ranch, CA 91326
Project was developed under the employment of another architecture firm
Interior renovation of a 40,000 Sq Ft space for a new Burlington Coat Factory
Stater Bros Façade Renovation
Stater Bros – 7511 E. Orangethorpe Ave, Buena Park, CA 90621
Project was developed under the employment of another architecture firm
Remodel of existing public façade and entrance area with minor modifications to the parking area
SCHOOLS
Compton Community College Instructional Building 1
Compton Community College – 1111 E Artesia Blvd, Compton, CA 90221
Project was developed under the employment of another architecture firm
New construction of a 2 story 30,000 sq ft building for the Compton Community College District consisting of classrooms and offices
Vista Grande Dining Facility
Cal Poly SLO – 1 Grand Ave, San Luis Obispo, CA 93407
Project was developed under the employment of another architecture firm
New construction of a 3 story 30,000 sq ft building for California Polytechnic State University in San Luis Obispo Consisting of Kitchen and Dining areas and administrative offices
Santa Monica Community College Student services building
Santa Monica Community College – 1900 Pico Blvd, Santa Monica, CA 90405
Project was developed under the employment of another architecture firm
New construction of a 360,000 sq ft Student Services Building for Santa Monica Community College consisting of three parking levels and three office levels
St Mark’s Pre-School and Kitchen Tenant Improvement
St Mark’s Episcopal Church – 330 E 16th St, Upland, CA 91784
A tenant improvement for use by San Bernardino County of an approximately 12,000 Sq Ft pre-school and kitchen involving the upgrade of preschool classrooms and the conversion of further classrooms into administrative spaces including staff lounge, conference room and offices. The remodel also includes the upgrade of the public restrooms to meet the latest accessible building code requirements as well as providing its users the option to use a single user restroom.
Media Tech Center
Bishop Alemany High School – 11111 N Alemany Dr, Mission Hills, CA 91345
Project was developed under the employment of another architecture firm
Tenant Improvement of K-12 Locker room into a computer technology center
OLQA Gymnasium
Our Lady Queen of Angels – 535 N Main St, Los Angeles, CA 90012
Project was developed under the employment of another architecture firm
New Construction of a K-12 gymnasium in Newport Beach California for the diocese of Orange County
Campus Accessibility Upgrades
Pierce Community College – 6201 Winnetka Ave, Woodland Hills, CA 91371
Project was developed under the employment of another architecture firm
Reconstruction / Remodel of multiple sites located at Pierce Community College to meet current accessibility standards
OFFICE SPACES
NHMC MOB TI
Northridge Hospital Medical Center – 18460 Roscoe Blvd, Northridge, CA 91325
A remodel of an existing shelled space of approximately 2,000 Sq Ft into an administrative office tenant improvement used for overflow including two new single user restrooms
Office Tenant Improvement
LB Pride – 1017 Obispo Ave, Long Beach, CA 90804
Project was developed under the employment of another architecture firm
Remodel of an existing non-profit 1st floor office in order to provide ADA accessible restrooms and ramps with the removal of exterior decorative canopies with minor repairs